Abbasi Residential Karbala
- Project: Abbasi Residential
- Client:-
- Location: Karbala, Iraq
- Starting Date: ?
- Status: ?

Description
This project is located in the north of Karbala, approximately 800 meters from the shrine of Abbas ibn Ali (peace be upon him). It is a mixed-use development comprising residential, commercial, and office spaces. The basement level includes parking, storages, electrical and mechanical control rooms, a kitchen, and some commercial areas. The three floors above it host commercial spaces, public areas, a Hussainiya, and a restaurant. The two interconnected towers above these floors rise for ten stories and contain hotel accommodation and apartments for sale. The construction period for this project was 30 months, with a total cost of approximately $21 million..